Freight train runs at 100km/h without locomotive operator from Kathua towards Pathankot

  • Facebook
  • Twitter
  • Reddit
  • Flipboard
  • Email
  • WhatsApp
Freight train runs at 100km/h without locomotive operator from Kathua towards Pathankot (Image: Twitter/karankapoor_ani)
Freight train runs at 100km/h without locomotive operator from Kathua towards Pathankot (Image: Twitter/karankapoor_ani)

New Delhi : A disturbing event unfolded in Punjab as a freight train, which had been stationary at Kathua station in Jammu and Kashmir, unexpectedly started moving downhill towards Pathankot without a designated locomotive operator on board. 

According to a report by news agency ANI, the driverless train was successfully brought to a halt near Ucchi Bassi in Mukerian, Punjab after significant efforts by railway officials.

Watch video of the moving train below:



A big relief came with the fact that no other train was on its way as the driverless train ran for around 80 kilometres before being brought to a halt.

It has been learned that the driver had got down to take a sip of tea; by the time he came back the train started running downhill as no hand breaks were applied in the engine.

An inquiry in the matter has been initiated.